This is a vintage French black mobile telephone… on a very long lead! Likely originally for use in a workshop or yard enabling the user to take the phone with them on it’s metal stand. Untested, sold as seen. Great prop!
Found: Normandy, France
Made: French
Size: about 72 x 33 x 40 cm – 28.5 x 13 x 16 inches
Weight: 3.6 kg
Condition: in vintage condition, untested, finger dial is sitting in the wrong position and needs some attention, surface rust to stand, as with all our electrical items sold as found, untested for spares / repairs, please see all pictures
Shipped from France




